Central Heating Systems to be Powered Down on Saturday, May 3rd, 2025

Please be advised following a review of the longterm forecast it has been determined the central heating system will be powered down at both 30 & 35 Charles Street West on Saturday, May 3rd, 2025. The forecast calls for temperatures high enough to maintain a 21 degree temperature within 30 & 35 Charles Street West which allows for the central heating system to be powered down.

Elevator Etiquette and Safety

This is a friendly reminder to please avoid blocking or attempting to stop closing elevator doors with your hands or any body parts. Instead use the open and close buttons to operate them safely. For additional elevator safety tips, click the button below.

May Unit Renovations at Charles Street

For the month of May, the following floors will have units under renovation. Residents may hear noisy work from 9:00am – 5:00pm, Monday – Saturday.

30 Charles35 Charles
21st floor
12th floor
9th floor
7th floor
5th floor
4th floor
21st floor
20th floor
18th floor
17th floor
15th floor
10th floor
9th floor
6th floor
5th floor