Charles Street

Maintenance and Operations Updates

35 Charles Annual Unit Inspections

Please be advised Annual Unit Inspections are expected to begin at 35 Charles St. W. on Tuesday, September 9th, 2025.

Residents can expect that the inspections carried out by our Maintenance Technician staff will primarily focus on the safety matters listed below:

  1. Inspection of unit smoke alarm for operational status and expiry date;
  2. Inspection of unit fire alarm speaker and horn to ensure no obstructions;
  3. Inspection of unit front door closer to ensure operation;
  4. Inspection of unit window locks to ensure presence and operation;
  5. Determining the presence of window installed Air Conditioner

All unit inspections should be completed by end of October, approximately.

Residents will receive a Notice of Entry, with the inspection date and a 3-hour entry window, either in the morning, mid-afternoon, or early evening. There will be no inspections prior to 11:00am or after 7:00pm and inspections will only take place Tuesday-Thursday. If there are any issues with the date of entry, residents are asked to contact the Residence Office as soon as possible so the inspection date can be rescheduled.

The maintenance staff member will require access to all areas of the unit to complete the inspection, and if all items are in order, the inspection should be no more than 10 minutes. If an inspection item needs replacement or repair, such as an expired smoke alarm, this repair must be completed on the same day of the inspection. Maintenance staff will be asked to carry material stock and tools with them to complete such repairs, when necessary.

We very much appreciate your patience and understanding through previous inspection periods and thank you in advance for your co-operation with all future inspections.

If there are any questions or concerns about the above information, please contact:
Andrew Froud
Junior Property Operations Coordinator
andrew.froud@utoronto.ca

Thank you for your attention to this matter.

September Unit Renovations at Charles Street

For the month of September, the following floors will have units under renovation. Residents may hear noisy work from 9:00am – 5:00pm, Monday – Saturday.

30 Charles35 Charles
5th floor
7th floor
12th floor
16th floor
17th floor
18th floor
19th floor
20th floor
2nd floor
3rd floor
6th floor
7th floor
11th floor
12th floor
15th floor
16th floor
17th floor
19th floor
20th floor

Related